Use the remainder of the laminate flooring planks you cut at the end of row one to start the next row as long as it s longer than 1 foot.
How to put a laminate flooring down.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
Lay a loose plank of your new flooring upside down against the door casing over a piece of the underlayment and saw off the bottom of the casing.
If it s not start the row with a plank cut to a length greater than 1 foot.
Step 1 let the boards acclimate.
Install baseboards and molding remove the spacers around the border and install baseboards and quarter round molding covering the plastic moisture barrier on the wall and the gap between the wall and the flooring.
How to install laminate flooring.
Doing so enables you to slide the new planks underneath the casing.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
Start the second row where you started off the first.